1623 District of Mission

On a Mission to Go Green—BuildWorks competitively bid, then successfully delivered a full-service design-build solution for a new composting facility for the District of Mission in less than 100 days!  The 10,000 square foot MegaDome keeps the primary composting operation out of the weather, improving the process and the final product. Unique project features includes a rain-water collection system for compost wetting; the patented AirFloor® in-floor aeration and leachate control system, as well as aeration blowers and controls. The MegaDome frame is hot-dip galvanized for extended performance in a corrosive environment.